Talking to the mining engineer at the AGM (Chris), he was ready then to go and throw the plant together. It's already built in his head.
Easy build, good topology, chemical free operation ... a good mine to put together.
It's invigorating to talk to people that are really enthusiastic and genuinely excited about what they are doing.
- Forums
- ASX - By Stock
- VRC
- Ann: Pre-Feasibility Study Completed
Ann: Pre-Feasibility Study Completed, page-193
-
- There are more pages in this discussion • 60 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add VRC (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
-0.001(12.5%) |
Mkt cap ! $14.55M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.4¢ | $2.184K | 552.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
40 | 75918292 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 5239231 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
40 | 75918292 | 0.003 |
16 | 23416715 | 0.002 |
8 | 18150001 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 5239231 | 7 |
0.005 | 16815298 | 15 |
0.006 | 8880468 | 15 |
0.007 | 11063001 | 6 |
0.008 | 4864155 | 6 |
Last trade - 13.31pm 04/10/2024 (20 minute delay) ? |
Featured News
VRC (ASX) Chart |