To quote from the announcement:
'the first batch of MEMS devices received from the fab deviated from the required voltage specifications'
and
'The company has instructed its fab to urgently advance the backup wafer lots with the inclusion of the design change'
and
'The company plans to further update the market when the fabs return from holiday break with detailed timelines.'
Nothing is fixed yet.
- Forums
- ASX - By Stock
- AKP
- Ann: Integration Stage Update
Ann: Integration Stage Update, page-19
Featured News
Add AKP (ASX) to my watchlist
(20min delay)
|
|||||
Last
$6.20 |
Change
0.000(0.00%) |
Mkt cap ! $181.1M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AKP (ASX) Chart |
Day chart unavailable