I read it as 2.3 MT SF @ $70 = (70-55) × 2.3 = $34.5 M 1.2 MT Lump @ 70 = (70 -55) x 1.2 = $18 M 0.5 MT VF @ $66 = (66 - 55) x 0.5 = $5.5 M Which adds up to $58 M, so not sure where the $2 M cash has gone?