Source: http://epsl.com.au/Shipping/PLANNED_MOVEMENTS.PDF
Issued: 17/02/2017 7:00:05 AM
Estimated duration of the loading: 27.02.2017 - 01.03.2017(?)
Than Blessing SW will (hurriedly & hopefully) leave EPR - otherwise "E.R.LONG BEACH" will push us with charming 93643t/301m away.