QGC queensland gas company limited

the next qgc....., page-10

  1. 3,559 Posts.
    Weekly Drilling Report
    Another successful drill

    Maryborough Basin - Queensland
    The Burrum-2 well, the second of the two coal seam gas well program in ATP 613P in the Maryborough Basin of southeast Queensland, spudded on 8 March. The wells are designed to evaluate the coal seam potential of the previously unexplored Burrum Coal Measures in the northern portion of the Burrum Syncline. At 06:00 hrs on 14 March Burrum-2 was at a depth of 390 metres. Several coal seams have been intersected and sampled for desorption analysis.
    Eureka Petroleum, a wholly-owned subsidiary of Energy Investments Limited, is funding 100% of a two-staged coal seam gas exploration program, in return for which it will be assigned a 90% working interest in the Burrum Syncline farmin area. Stage 1 comprises the current two-well program. Magellan has the right to back-in to retain up to a 50% participating interest in any development by matching Eureka’s prior expenditures.

    Burrum-2 Details:
    Petroleum Title: ATP 613P Queensland
    Location: Approximately 2 km northeast of the township of Howard and approximately 55 km north of the city of Maryborough
    Coordinates: MGA 94 56457785E 7200350S
    JV Operator: Magellan Petroleum Corporation
    Drilling Rig: Depco Rig 22 - UDR 1200
    Proposed Total Depth: 600 metres
    Objectives: Coals of the Burrum Coal Measures
    Operations for period: Burrum-2 spudded on 4 March 2007 and was drilled in open hole to a depth of 115 m. The well was then fully cored and at 06:00 hrs on 14 March was at a depth of 390 m.
    Progress for Period: 390 metres.
    Participants in Burrum-2 are:
    Magellan Petroleum Corporation (Operator) 10%
    Energy Investments Limited 90%
 
watchlist Created with Sketch. Add QGC (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.