AXN 4.88% 3.9¢ alliance nickel limited

speculative buy

  1. 292 Posts.
    Well end of march we will see some big results, i have sold off all my other stocks and ready to go all in, this looks like a winner however you look at it.
    hopefully we can see a T/O ot JV happening with this result.

    If you look at JBM, you'll see this is where it is going to head.

    GME Resources (GME)
    Encouraging column leach tests on nickel laterite
    Speculative Buy 0.610
    GME has reported the results of column leach tests
    representing the nickel laterite profile at the Hepi and Mt
    Kilkenny projects located near Murrin Murrin in the north
    eastern goldfields of WA. The testwork, undertaken in SGS
    Lakefield’s laboratory in Perth, was targeting an average
    extraction of 70% over 120 days. Extraction rates of nickel
    on three samples tested ranged from 73.2% to 78.4% and for
    cobalt the extraction rate ranged from 80.4% to 94.2%.
    The results show that the nickel saprolite resources at Hepi
    and Mt Kilkenny projects are amenable to heap leach
    processing. In each case, slump of the agglomerates column
    was minimal over the time period and excellent percolation
    rates were maintained over the 120 day period. Acid
    consumptions are reported as acceptable for the saprolitic
    ore type. Down stream metal recovery testwork is now
    proceeding on solutions from the column leach tests.
    The indicated and measured resource located at Hepi and
    Mt Kilkenny is 16.8 million tonnes averaging 1.30% nickel
    and 0.10% cobalt and containing 218,000 tonnes of nickel
    17,000 tonnes of cobalt. These resources represent less
    than 30% of the defined high grade resources within GME’s
    NiWest nickel laterite project. Much of the additional
    resource is now known to be similar high grade saprolitic
    material which should be suited to heap leaching.
    These positive results will be used as key inputs to the current pre-feasibility study scheduled for completion by the
    end of March 2007. GME considers that the testwork
    provides a strong basis for it to progress to a trial heap leach
    in the second half of 2007 followed by a bankable feasibility
    study which is expected to commence towards the end of
    2007.
    Based on the Hepi and Mt Kilkenny resources it is
    anticipated that the scale of operation now being considered
    will encompass a stand alone acid plant and target
    production in the region of 12,500 to 15,000 tonnes per year
    of nickel for a minimum ten years.
    A major RC drill out program is scheduled for the Mt Kilkenny
    and the Eucalyptus projects through to June 2007. In
    addition a drilling program will be undertaken at Eucalyptus
    to supply core samples for a new round of column test work.
    Total resources at the NiWest nickel project are currently
    48.76 million tonnes averaging 1.25% nickel and 0.10%
    cobalt and containing 609,000 tonnes of nickel and 49,000
    tonnes of cobalt.
    GME has recently appointed Mr Mick Ryan as Project
    Manager for the NiWest nickel project. He has over 20 years
    experience in the development of heap leach projects as well
    as nickel laterite projects. His experience includes the Telfer
    and Red Dome heap leach operations, the Syerston laterite
    project in NSW, the Murrin Murrin project and Intec’s
    hydrometallurgical process development at Hellyer in
    Tasmania.
 
watchlist Created with Sketch. Add AXN (ASX) to my watchlist
(20min delay)
Last
3.9¢
Change
-0.002(4.88%)
Mkt cap ! $28.30M
Open High Low Value Volume
4.1¢ 4.1¢ 3.9¢ $5.821K 143.8K

Buyers (Bids)

No. Vol. Price($)
2 232445 3.9¢
 

Sellers (Offers)

Price($) Vol. No.
4.9¢ 57974 1
View Market Depth
Last trade - 15.46pm 15/11/2024 (20 minute delay) ?
AXN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.