Oops forgot the PE
Column 1 Column 2 0 Calendar Year 2021 1 SDV 2 LCE production tonnes 35,000 3 Price per tonne 14,000 4 Operating Cost per tonne 3,000 5 EBITDA (USD) 385,000,000 6 AUDUSD 0.77 7 EBITDA (AUD) 500,000,000 8 Attributable to GXY (100%) 500,000,000 9 Interest (100m debt) 10,000,000 10 Depreciation 1,740,000 11 Taxes @ 30% 146,478,000 12 NPAT (AUD) 341,782,000 13 EPS of SDV (1946m shares) 0.176 14 15 Mt Cattlin 16 Spodumene tonnes 225,000 17 Price per tonne 700 18 Operating Cost per tonne (USD) 300 19 EBITDA (USD) 90,000,000 20 AUDUSD 0.77 21 EBITDA (AUD) 116,883,117 22 Interest AUD (USD 40m debt) 3,636,364 23 Depreciation 344,148 24 Taxes @ 30% 33,870,782 25 NPAT (AUD) 79,031,824 26 EPS of Mt Cattlin 0.041 27 28 Total EPS 0.216 29 PE 22 30 Target SP 4.76
So total pessimist view is A$1.92, blue sky is A$4.76
This is my own views, build your own models
- Forums
- ASX - By Stock
- GXY
- Model Update
Model Update, page-11
-
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GXY (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online