According to the drilling update provided by the Company on 24 Jan 2017,
"......... Approximately 1,200m of RC drilling is now underway and is expected to be completed before the end of January, with assay results to hand by the end of February. Holes are designed to test for extensions to the Sinclair Caesium Zone south of drill hole PDRC083 and north of PCRC074; and as an initial test of a high priority lithium-caesium target located 175m south of the Sinclair Zone. ......."
So hopefully we should expect to receive another update very soon!
- Forums
- ASX - By Stock
- ESS
- PIoneer Dome assay results due
PIoneer Dome assay results due
-
- There are more pages in this discussion • 49 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)