From the 31st Jan ann:
Second round of drilling results from ongoing infill and extensional RC campaign at Bombora
(32 holes)
The latest results follow recently reported intercepts such as 24m @ 7.75g/t Au from 9m and
19m @ 7.56g/t Au from 49m (24 January 2017; first round 100m x 20m results); assay results are
pending for 27 RC holes
From todays ann (1st March)
The new RC drill holes at Bombora comprise 24 holes for 3,369m (BBRC0174-0183, BBRC0230-0240,
BBRC0241-0242 and BBRC0245). Many of the re sults are based on preliminary 4m composite samples (1m sample results pending). Assay results for three drill holes, BBRC0241-0242 and BBRC0245, are limited to partial coverage 1m samples (composite assays pending).
BBRC0231 was in today’s results
BBRC0231 28m @ 3.56 124m 8m @ 11.54 4m @ 20.98
Assuming this was just an example.
Are there specific drill hole numbers that have been listed or are you concluding that because the numbers are not sequential some are missing?
- Forums
- ASX - By Stock
- BRB
- Ann: More shallow, high-grade infill results at Lake Roe Project
Ann: More shallow, high-grade infill results at Lake Roe Project, page-11
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)