TEG 0.00% 0.4¢ triangle energy (global) limited

So now you are interested in Reid's Dome !, page-61

  1. 1,157 Posts.
    lightbulb Created with Sketch. 292
    AWE have stated that the rig will be drilling on their lease for a full 3 months for 2 drills.
    Looks like we will use same rig. I would estimate 4 - 6 weeks providing the drill goes to plan.
 
watchlist Created with Sketch. Add TEG (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.