Are they just running the dst on the leadville shows?
If they've stopped drilling, tripped out and got the equipment in the hole why would they just do leadville? Why not test the other shows all the way down? Especially if it only takes an hour or two to test each show/pay zone.
I don't get it. Anyone with ideas?
Add to My Watchlist
What is My Watchlist?