NAG 6.25% 1.5¢ nagambie resources limited

War & Gold, page-186

  1. 55,906 Posts.
    lightbulb Created with Sketch. 1058
    Here's some info from the EES

    I guess the key will be - who inspects the soil.

    My guess is that the EPA will be under some pressure to make sure they do it - especially since it has been established that there is a certain amount of PASS under about 25 m

    MANAGING EXCAVATED MATERIAL

    Construction of Metro Tunnel will generate an estimated two million cubic metres of excavated rock and soil.
    During construction, there will be limited opportunities to re-use excavated clean fill as part of the project. As such, it will need to be removed from construction work sites and could be potentially re-used at other locations.
    Materials that cannot be re-used due to contamination will be disposed of in line with Environment Protection Authority (EPA) Victoria and WorkSafe Victoria guidelines at appropriately licenced facilities.
    In most cases, rock and soil excavated during construction will be removed from construction sites as quickly as possible. However short-term stockpile areas will be created at TBM launch sites and other major excavation sites in order to temporarily store materials that cannot be removed immediately. These stockpile areas will be carefully managed in line with EPA Victoria guidelines.

    http://metrotunnel.vic.gov.au/planning/ees/geology-and-ground-conditions
 
watchlist Created with Sketch. Add NAG (ASX) to my watchlist
(20min delay)
Last
1.5¢
Change
-0.001(6.25%)
Mkt cap ! $11.94M
Open High Low Value Volume
1.6¢ 1.6¢ 1.3¢ $22.29K 1.596M

Buyers (Bids)

No. Vol. Price($)
1 50000 1.4¢
 

Sellers (Offers)

Price($) Vol. No.
1.5¢ 83450 1
View Market Depth
Last trade - 15.52pm 08/10/2024 (20 minute delay) ?
NAG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.