Bad decision.
Why? Don't know. Engineers sometimes look after their own interests above their clients.
I think that the decision needs to be reviewed.
Where we went from, was from Miro's post:
Total Mining Cost:
Reviewed scoping study: from 90 to 52
PFS: 70.3
FECAB:
Reviewed scoping study: not mentioned, 72 in Presentation 2015
PFS: 104.9
Lithium Carbonate Plant:
Reviewed scoping study: from 164 to 117
PFS: 179.9 millions
Total capital cost:
Expected based on reviewed scoping study: 241
Scoping study: 326
PFS: 393.4
So from September last year, in 6 months, the CapEx went through the roof, the OpEx went through the roof, the Recovery dropped and the by-product credits dropped.
And we got a couple of lines in the PFS about why and some contradictory information from the Czech director.
A couple of sentences in a prearranged and prequestioned interview over skype doesn't cut it.
- Forums
- ASX - By Stock
- EMH
- Great read about EMH
Great read about EMH, page-51
-
- There are more pages in this discussion • 167 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EMH (ASX) to my watchlist
(20min delay)
|
|||||
Last
15.5¢ |
Change
0.005(3.33%) |
Mkt cap ! $32.15M |
Open | High | Low | Value | Volume |
15.0¢ | 15.5¢ | 15.0¢ | $18.44K | 122.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 69555 | 14.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.5¢ | 22848 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 69555 | 0.140 |
4 | 76229 | 0.135 |
2 | 37699 | 0.130 |
1 | 25000 | 0.120 |
1 | 5000 | 0.115 |
Price($) | Vol. | No. |
---|---|---|
0.155 | 22848 | 1 |
0.160 | 33724 | 2 |
0.170 | 23714 | 1 |
0.175 | 580 | 1 |
0.200 | 1800 | 1 |
Last trade - 16.10pm 19/11/2024 (20 minute delay) ? |
Featured News
EMH (ASX) Chart |