All the ADRC technologies that gets ported onto a chip, that has been spoken about at length because of the length of time for porting to take place, none of those chips will be in the icharger or ipark, hence the reason the icharger will work with the app. It's a simple Bluetooth connection from my understanding and we have developed an app to control the Bluetooth connection. The ipark is the new product but the only addition over the icharger is the location function. None of which is a part of the Xped ADRC technologies. This is a deal that doesn't utilise our core tech, we just happened to get a good deal to build an app from my understanding.
All the above based on guesstimates and potential piss poor dot joining
- Forums
- ASX - By Stock
- OAK
- Ann: Lenze App Delivered
Ann: Lenze App Delivered, page-225
-
-
- There are more pages in this discussion • 84 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OAK (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.889M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 47 | 7.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.5¢ | 1524 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 47 | 0.070 |
1 | 20100 | 0.061 |
1 | 100000 | 0.060 |
1 | 86000 | 0.058 |
1 | 55000 | 0.053 |
Price($) | Vol. | No. |
---|---|---|
0.095 | 1524 | 1 |
0.175 | 22450 | 1 |
0.180 | 30000 | 1 |
0.190 | 29137 | 1 |
0.455 | 6945 | 1 |
Last trade - 16.12pm 16/08/2024 (20 minute delay) ? |
Featured News
OAK (ASX) Chart |
Day chart unavailable