- The results are ready for hole 1 & will be released with hole 2.
- Hole 4 has multiple aquifers
- The company is going to concentrate their strategy on hole 2.
Time line
Hole 2 is currently at 650m with 850m to go of the 1500m total at the current rate of 10m/20mins. This means that the hole should be completed after approximately 28hours without downtime so we are probably looking at 2 days.
After that samples need to be sent to the lab, queued in their work schedule, tested, analysed and reported on. Hole one was announced that the testing had begun in the 1/5/17 report and has now been announced to be completed on the 29/5/17 or 28 days.
So between drilling and results were are looking at approximately 30days or the very end of June.
Exciting times ahead. GLTAH
- Forums
- ASX - By Stock
- RMX
- Ann: Red Valley Drilling Update
Ann: Red Valley Drilling Update, page-19
-
- There are more pages in this discussion • 722 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RMX (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.1¢ |
Change
0.001(10.0%) |
Mkt cap ! $4.260M |
Open | High | Low | Value | Volume |
1.0¢ | 1.2¢ | 1.0¢ | $9.55K | 844.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 1479612 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.2¢ | 1256252 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
10 | 1479612 | 0.010 |
10 | 1604156 | 0.009 |
22 | 5718950 | 0.008 |
11 | 3666714 | 0.007 |
6 | 2781690 | 0.006 |
Price($) | Vol. | No. |
---|---|---|
0.012 | 1256252 | 6 |
0.013 | 1227028 | 4 |
0.014 | 1002971 | 6 |
0.015 | 1174359 | 7 |
0.016 | 1630426 | 4 |
Last trade - 12.29pm 07/11/2024 (20 minute delay) ? |
Featured News
RMX (ASX) Chart |