Bit optimistic re start-up Dan?
Plant doesnt arrive till late 2007 which means minimum 6 months(very optimistic)to 12 months(much more likely) till production after it arrives.
The only thing that might really push it along quicker is if DRA want to get the digit out.It might be prudent for DRA to be issued some performance options related to earlier production start-up in this regard.Nothing like some incentive.
Aim have gone back to saying they will have production by early-mid 2008(after anncing not that long ago that production was back to late 2008) which is what they anncd when NS bought in.Im betting its been made pretty clear to Aim that this was one main factor NS bought when they did at what they did.
d.
- Forums
- ASX - By Stock
- AIM
- technically speaking.
technically speaking., page-17
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AIM (ASX) to my watchlist
(20min delay)
|
|||||
Last
83.0¢ |
Change
0.025(3.11%) |
Mkt cap ! $173.3M |
Open | High | Low | Value | Volume |
79.5¢ | 83.5¢ | 79.0¢ | $401.8K | 489.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 10532 | 82.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
83.0¢ | 33091 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 10532 | 0.820 |
1 | 5000 | 0.800 |
1 | 2700 | 0.780 |
2 | 17500 | 0.775 |
2 | 7000 | 0.770 |
Price($) | Vol. | No. |
---|---|---|
0.830 | 33091 | 1 |
0.835 | 23701 | 1 |
0.840 | 59800 | 3 |
0.850 | 87587 | 6 |
0.870 | 6316 | 1 |
Last trade - 16.10pm 09/10/2024 (20 minute delay) ? |
Featured News
AIM (ASX) Chart |
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
SPONSORED BY The Market Online