88E 20.0% 0.2¢ 88 energy limited

Ann: Operations Update, page-106

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3829
    They are done with the drilling & logging. Will perforate the liner over the wkend orearly nxt week. And then pump the proppant etc, monitor the pressure, Shut the well, record the ISIP (initial shut in pressure).

    Then take regular pressure readings. over the nxt few days. Where reqd they may pump some more fluid downhole at a controlled rate in BPM (bbls per minute).

    Cleanup will happen later on, when they open the well & flow the fluids/returns to stock tanks or via a separator.

    What htey need is a actual fluid sample from the prod test to record its GOR or CGR etc. FWIW's DeMac used apprc 1390 as their GOR & 400 as the CGR to give 985 mmbbls gross prospective without an actual sample from the HRZ, hence the need to flow & get a real GOR etc etc. Business end of the well, GLTA..
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.