RDS 0.00% 0.3¢ redstone resources limited

drill results , page-2

  1. 467 Posts.
    is there a time frame sequence of some sort eg another 5 drill hole samples every 2 or three weeks. so drill sample results will be coming out in dribs and darabs for months to come,

    Or do they collect a number of drill samples and then release the results over a number of weeks.

    This side of things i do not understand to well.
 
watchlist Created with Sketch. Add RDS (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.