At the meeting Alan Doyle said that JORC could be up to 6 months away as there were some drilling problems (quality of the rigs available rather than ground issues). This would not delay the Pt spin out which he was trying to finalise through the UK shortly. The UK deal may be either a float or a back door listing. This was not yet finalised however a back door was preferable as it would be a lot quicker process.
- Forums
- ASX - By Stock
- GAU
- will the jorc be delayed
will the jorc be delayed, page-2
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GAU (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO & MD
Charles Armstrong
CEO & MD
Previous Video
Next Video
SPONSORED BY The Market Online