Would the bare minimum (300mt) to get the deal done be enough to push this up to the dollar mark? Or do u think the resource would have to be something a lot higher?
They still get to keep 30% of the project so obviously the more ore they have in the ground the better, just wondering if the market would be disappointed if there was only 300mt...
- Forums
- ASX - By Stock
- CLE
- how much ore is needed to get cfe to 1 dollar
how much ore is needed to get cfe to 1 dollar
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CLE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $12.73M |
Open | High | Low | Value | Volume |
0.1¢ | 0.1¢ | 0.1¢ | $410 | 409.9K |
Featured News
CLE (ASX) Chart |