"but the project either would need to stack up on the minimum price level"
Seriously? Go read the DFS. Was based on $539/tonne. Floor price of this BOA is $550/tonne. i.e minimum floor is above the feasibility study, i.e proof the project is economically viable.
Payback period from the DFS is 1.8 years. Floor price is in place for 3 years. i.e they have almost twice the time they need to payback any debt at the floor price.
Based on current prices they will be able to pay debt back in essentially a single year.
- Forums
- ASX - By Stock
- 1MC
- Ann: Altura Completes Two Binding Offtake Agreements
Ann: Altura Completes Two Binding Offtake Agreements, page-88
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 1MC (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.403M |
Open | High | Low | Value | Volume |
3.4¢ | 3.6¢ | 3.4¢ | $518 | 14.54K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 89390 | 3.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.5¢ | 9888 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 89390 | 0.034 |
1 | 250443 | 0.033 |
1 | 2091 | 0.032 |
4 | 102290 | 0.031 |
3 | 50666 | 0.030 |
Price($) | Vol. | No. |
---|---|---|
0.035 | 9888 | 1 |
0.036 | 89658 | 2 |
0.037 | 65000 | 1 |
0.038 | 75000 | 1 |
0.039 | 70000 | 1 |
Last trade - 15.57pm 27/08/2024 (20 minute delay) ? |
Featured News
1MC (ASX) Chart |
The Watchlist
SBW
SHEKEL BRAINWEIGH LTD
Dani Nadri, Country Manager Australia
Dani Nadri
Country Manager Australia
SPONSORED BY The Market Online