"Crushers are still under design n supply warranty, and they have now fixed it.."
Production was adversely impacted during the month as a result of a major failure to the site’s primary jaw crusher – which functions in the short term are being provided by two rented mobile crushing units. An order for a replacement cone crusher was placed 5 July, with installation expected to occur by end of Q1 FY 2017.
CDU Price at posting:
35.0¢ Sentiment: None Disclosure: Not Held