Resource Roadhouse on 1 August regarding Mount Alexander:
"Prineas said the company would be looking at a pre-feasibility study within 6 to 12 months.
“Because of the shallow mineralisation at this stage we’re considering an open cut or box cut, but whatever we do it’ll be a low cost operation which will be a big advantage,” he explained."
As far as I can tell, that is the first reference by SGQ to a time line on a PFS. After the PFS, there will be the DFS and then a decision to mine and the time line around all that could be 2 to 3 years. Of course, if the price of nickel, copper and cobalt continue to rise and the A$ falls against the US$, the company might fast track the project studies and possibly reduce the time before mining commences.
AIMO
Cheers
Mulac1
- Forums
- ASX - By Stock
- SGQ
- Ann: St George Boosts Technical Team
Ann: St George Boosts Technical Team, page-14
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SGQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.6¢ |
Change
0.001(4.00%) |
Mkt cap ! $28.30M |
Open | High | Low | Value | Volume |
2.6¢ | 2.7¢ | 2.6¢ | $133.5K | 5.087M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 1233380 | 2.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.7¢ | 651559 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 38461 | 0.026 |
8 | 1802003 | 0.025 |
12 | 2514717 | 0.024 |
4 | 6021864 | 0.023 |
3 | 1578922 | 0.022 |
Price($) | Vol. | No. |
---|---|---|
0.027 | 651559 | 3 |
0.028 | 650000 | 2 |
0.029 | 543662 | 3 |
0.030 | 1337777 | 5 |
0.031 | 14815 | 1 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
SGQ (ASX) Chart |