MGO 0.00% 14.0¢ marengo mining limited

where is the pfs, page-6

  1. 438 Posts.
    from the article of 13th July as posted previously:

    The next test, will come in the third week of July, the time nominated by Emery as the release date of the pre-feasibility study. With the big event so close he was naturally hesitant to give too much away to Minesite. However, he did say that all of the numbers were in, and the job at hand now was “writing up” the document. “The numbers look good,” he said. “And we’ve been pretty rigorous with our copper and molybdenum price assumptions. Copper has been factored in at US$1.50 a pounds (versus the current price of around US$3.60). We’ve made a similar cut in the price of moly which is shaping as a very valuable by-product for the development.”
 
watchlist Created with Sketch. Add MGO (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.