There are no questions about the technology, it is just managements ability to deliver now. The share price will remain low until they start to deliver.
Kalina Cycle® - Power Plant Performance
- Since installation of the Kalina Cycle® Power Plant at the Kashima Steel Works in September 1999, the power plant has operated on a trouble-free basis with a capacity factor above 96%.
- Performance tests conducted by the Japanese Ministry of International Trade & Industry (MITI) confirm that the performance of the Kalina Cycle® Power Plant exceeds both the design specifications and the expectations of Sumitomo Metals.
- The achieved electrical power output of the power plant corresponds to that calculated from the energy-mass balances of the Kalina Cycle®.
- Legal requirements require turbines to be inspected every 4 years
- Forums
- ASX - By Stock
- KPO
- dear kpo management
dear kpo management, page-29
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KPO (ASX) to my watchlist
|
|||||
Last
0.6¢ |
Change
0.001(20.0%) |
Mkt cap ! $14.91M |
Open | High | Low | Value | Volume |
0.6¢ | 0.6¢ | 0.6¢ | $33.42K | 5.571M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 8921168 | 0.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 350000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 8921168 | 0.005 |
6 | 8100000 | 0.004 |
9 | 9803637 | 0.003 |
10 | 11311167 | 0.002 |
5 | 2428115 | 0.001 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 350000 | 2 |
0.007 | 3723936 | 8 |
0.008 | 4000000 | 1 |
0.009 | 180000 | 2 |
0.010 | 30000 | 1 |
Last trade - 11.29am 16/08/2024 (20 minute delay) ? |
Featured News
KPO (ASX) Chart |