GW1 0.00% 5.0¢ greenwing resources ltd

Ann: Graphmada Graphite Mine Operational Update, page-2

  1. 2,426 Posts.
    lightbulb Created with Sketch. 504
    Great progress ! congratulations to management and to long term shareholders ! Some highlights :

    1- Refurbishment on-budget and on-schedule !

    2- Major Equipment Items fully paid (huge derisking of the refurbishment program) and shipment to Madagadcar already commenced ! (IMO as I speculated arrival earlier than expected by end of september instead of october)

    3- New flotation cells (manufactured on-site !) already installed ! (doubling of the flotation circuit capacity)

    4- New foundations and civil works well advanced for the installation of the state of the art 12.000tpa drying circuit !

    5- Many equipment items are being fabricated on-site ! resulting in important CAPEX savings, time savings, maintenance costs savings, and accumulated expertize which will help greatly the company in its future expansion of the plant to 20.000tpa+

    Very exciting times ahead of us, I have no doubt in my mind they will achieve more than 6000tpa large flakes production at 94%+ purity by the end of this year (I even expect 7000tpa+ and some off the charts 96% - 98% purity for the largest super jumbo flakes at 35mesh+ which they could command easily some 1800$+ per tonne).

    Happy multi-bagger graphite investment to all !
    Last edited by DoctorFouad: 28/08/17
 
watchlist Created with Sketch. Add GW1 (ASX) to my watchlist
(20min delay)
Last
5.0¢
Change
0.000(0.00%)
Mkt cap ! $9.062M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 11904 4.2¢
 

Sellers (Offers)

Price($) Vol. No.
4.5¢ 6018 1
View Market Depth
Last trade - 10.22am 18/07/2024 (20 minute delay) ?
GW1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.