Hi all,
Well I am not an underground miner but this latest announcement tells us the ore body is a vertical structure.
Intuitively I think that a horizontal orebody would be easiest to mine....ie you load the truck and drive out.
a sloping orebody you would stope.
But a vertical orebody means that all the declines must be slower to advance downward or they would outpace the orebody.........so it's a ratio of development costs to orebody costs
So I'd await the projected mining method / costs and budgets before I'd buy.
- Forums
- ASX - By Stock
- TAM
- director resigns ooops
director resigns ooops, page-11
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TAM (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.5¢ |
Change
0.003(9.38%) |
Mkt cap ! $41.12M |
Open | High | Low | Value | Volume |
3.2¢ | 3.5¢ | 3.2¢ | $24.59K | 720.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 30303 | 3.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.4¢ | 250000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 30303 | 0.033 |
4 | 492442 | 0.032 |
5 | 1612741 | 0.031 |
4 | 480258 | 0.030 |
3 | 375000 | 0.029 |
Price($) | Vol. | No. |
---|---|---|
0.034 | 250000 | 1 |
0.035 | 167674 | 2 |
0.036 | 250000 | 1 |
0.038 | 200000 | 1 |
0.039 | 80000 | 1 |
Last trade - 13.14pm 27/09/2024 (20 minute delay) ? |
Featured News
TAM (ASX) Chart |