Was wondering where you got the insight that D001 was re drilled in this announcement,?
As you say research is always the key.. CONFIRMED. Thanks Mistie
Now why would they drill another 150 metres unless cores had visible spodumene ?
Hole 7 looks like will not need to go past 70 metres before spodumene present without weathering.
Table 2 – Summary of Drill Hole Data Completed and In Progress Hole_ID Easting (mE) WGS 84 UTM Northing (mS) WGS 84 UTM EOH (m) Dip (deg) Azim (deg)
Status MO17DD001 542009 9189654 141.25 -65 330 Hole complete, assay results pending
MO17DD002 542394 9189730 301.20 -50 330 Hole complete, assay results pending
MO17DD003 542513 9190003 - -60 330 In progress
MO17DD004 542792 9190348 - -60 330 In progress
- Forums
- ASX - By Stock
- AVZ
- Possibly the world's largest hard-rock spodumene resource
Possibly the world's largest hard-rock spodumene resource, page-2653
Featured News
Add AVZ (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online