AGY 2.13% 4.6¢ argosy minerals limited

Benign Banter & Price Predictions, page-354

  1. 1,035 Posts.
    lightbulb Created with Sketch. 94
    Maybe you are counting chickens?
    Where are things up to with Stage 1?
    On completion of stage 1 AGY will have some ownership of the venture (50%) and be producing Lithium Carbonate. Production from the pilot plant (Construction of which began in March 2017) is now going to produce 500 tpa in March 2018 (previously 100-150 tons).
    Stage 2 is said to be fully funded by the Chinese deal and earthworks have started.
    How are things going with the production facility that will produce in a little over 6 months?

    Following is a list of some things that may be needed in that facility:

    the lab equipment,
    liquor tanks (stainless steel or acid resistant),
    Concrete, slabs, footings,
    Steelwork, supports, stands, stairs, hoppers
    water, large quantities
    pumps, motors, valves
    plumbing, water, acid, air, steam
    Control and electrical infrastructure
    Compressed air
    flotation, agitation,
    chemicals (large amounts),
    brine recirculation,
    temperature control, steam, boilers
    crystallisers,
    centrifuge
    drying, spray dryers,
    screening, sizing, peg mills
    handling, conveyors,
    packaging, scales
    bulk product transport,
    Contractors, welders, fitters, engineers, draftsmen
    Production staff,
    trucks, loaders, forklifts etc. etc. ect............


    Hope it's all happening??
  2. This thread is closed.

    You may not reply to this discussion at this time.

 
watchlist Created with Sketch. Add AGY (ASX) to my watchlist
(20min delay)
Last
4.6¢
Change
-0.001(2.13%)
Mkt cap ! $66.97M
Open High Low Value Volume
4.8¢ 5.0¢ 4.6¢ $70.12K 1.486M

Buyers (Bids)

No. Vol. Price($)
4 402580 4.6¢
 

Sellers (Offers)

Price($) Vol. No.
4.9¢ 61224 1
View Market Depth
Last trade - 16.10pm 29/08/2024 (20 minute delay) ?
AGY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.