Mate, know this, the energy crisis is forecast for next year and the year after.
If they got all their building permits right now, it would take 4-5 years to build a coal fired power station.
You can halve that time ,if it were gas fired.
Joyce backs gas pipeline from WA to east coast
https://thewest.com.au/news/wa/joyce-backs-gas-pipeline-from-wa-to-east-coast-ng-b88607419z
Raider
- Forums
- Political Debate
- ABC Insiders devotes Show to Monster Abbott.
ABC Insiders devotes Show to Monster Abbott., page-19
-
- There are more pages in this discussion • 36 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)