    NAGAMBIE RESOURCES LIMITED
    December 2015 Quarterly Report – 29 January 2016
    Page 4
    PASS in excess of the collective 300,000 tonnes or so per annum for Melbourne can still be taken in by
    Melbourne landfill sites but it then has to compete with “normal” landfill. Landfill charges in Melbourne are
    typically $140 to $150 per tonne. On top of that, PASS customers would have to pay a premium to the
    landfill operators to cover the PASS mitigation costs of lime addition, mixing and handling. Hence they would
    be paying over $150 per tonne.
    Melbourne’s Looming Landfill Storage Problem
    At the Victorian Waste Expo in October 2015, several industry speakers in a panel discussion said that
    developed landfill space in Melbourne was now at a critical level and that they were concerned that the new
    guiding principal for landfill planning in Victoria had become “Environmental Justice”.
    With the spread of suburbia in Melbourne and the growing public attitude towards new landfill sites or
    expansions of “not in my backyard”, the waste industry can only see the current landfill capacity problems
    getting worse.
    Melbourne’s Looming PASS Storage Problem
    Melbourne in recent years has been finding space for collectively around 300,000 tonnes per annum of “15%
    cover material” PASS in the city’s 17 landfill sites. If there is no space for additional PASS in Melbourne’s
    developed landfill sites, where will the big expansion of probably over 1,000,000 tonnes per annum of
    excavated PASS go? If there isn’t a solution, it is not clear how the rapid development of Fishermans Bend,
    the Western Distributor Project and the Melbourne Metro Rail Project can proceed.
    Nagambie Resources considers that the best environmentally-friendly, economic solution for Victoria’s
    looming PASS problem is to take advantage of the 1990s-era, water-filled open pits at the degraded
    Nagambie Mine site.
    Nagambie Resources PASS Storage Charge
    Nagambie Resources doesn’t intend to compete for the storage of the baseload circa 300,000 tonnes per
    annum of Melbourne PASS that currently finds a home spread across the 17 metropolitan landfill sites under
    the “15% cover material” EPA arrangement. The Company is only interested in bidding for the large
    quantities of PASS that is proposed to come from the rapid development of Fishermans Bend, certain large
    CBD high-rise buildings, the Western Distributor tunnel and the Melbourne Metro Rail tunnels.
    If Melbourne landfills could take some of the PASS from the new developments, the cost to the developers
    would be over $150 per tonne plus around $15 per tonne for trucking. The cost of trucking to Nagambie is
    around $25 per tonne, giving an additional trucking cost to Nagambie of around $10 per tonne.
    Nagambie Mining considers that, if it bids commercially less than $140 per tonne to store PASS under water,
    it has the capacity to build up to and accept an average of around 1.0 million tonnes per year over a 6.2 year
    life.
    The potential scale of the PASS Project is illustrated below:
     Total Capacity to Store PASS Under Water: 6.2 Million Tonnes
     Potential Life of PASS Project: 6.2 Years
     Potential Average Storage: 1.0 Million Tonnes per Year
     Comparative Market Storage Charge: Over $140 per Tonne
     Nagambie Resources Storage Charge: Commercially Less than $140 per Tonne
    Environmental Aspects of Backfilling the Pits with PASS
    The water in the two pits is strongly alkaline and provides a natural buffer for PASS storage. pH data (7.0
    is neutral) from 2007 to the present is shown in Figure 1. pH measurements would be taken every week
    during PASS storage and agricultural lime would be added to the water if required to ensure the water
    remained alkaline.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
1.6¢
Change
0.000(0.00%)
Mkt cap ! $12.85M
Open High Low Value Volume
1.6¢ 1.7¢ 1.6¢ $20.20K 1.221M

Buyers (Bids)

No. Vol. Price($)
3 202852 1.6¢
 

Sellers (Offers)

Price($) Vol. No.
1.7¢ 748563 3
View Market Depth
Last trade - 10.21am 16/07/2025 (20 minute delay) ?
NAG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.