It might only take 8 hours to stand and brace the frames but they need to be manufactured/assembled first, do they not?
Comments on these forums about the difficulties other trades might have in completing their work forget one thing. In future, architects and designers working for savvy, cost-conscious developers will design buildings around the HX/Fastbrick system. Its not just the walls that will change; the design and construction methodology for the whole house will improve accordingly.
- Forums
- ASX - By Stock
- FBR
- Pivac too busy
Pivac too busy, page-51
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.5¢ |
Change
0.002(4.65%) |
Mkt cap ! $215.5M |
Open | High | Low | Value | Volume |
4.3¢ | 4.5¢ | 4.2¢ | $148.4K | 3.404M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 1488242 | 4.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.5¢ | 855970 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 1488242 | 0.044 |
2 | 290700 | 0.043 |
9 | 865819 | 0.042 |
8 | 564054 | 0.041 |
11 | 1304083 | 0.040 |
Price($) | Vol. | No. |
---|---|---|
0.045 | 855970 | 7 |
0.046 | 424652 | 6 |
0.047 | 1744784 | 7 |
0.048 | 1489335 | 4 |
0.049 | 375000 | 3 |
Last trade - 16.10pm 17/09/2024 (20 minute delay) ? |
Featured News
FBR (ASX) Chart |