BAS compared to 88E, page-34

  1. 1,014 Posts.
    lightbulb Created with Sketch. 20
    That's what im thinking but, what do you make of this

    B1 producing 650 bopd
    B3 the zone produced at a stabilized 1742 bopd , the secondary objectives of the well are to appraise the extent of the oil pool discovered in the K1 sand in Bunian 3 ST@ which flowed at 1590 bopd on test and to assess the TRM-1 TRM-2 Sandwich it was not possible to evaluate the earlier well.
    B4 100-200bopd
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.