Lets hear some DSO valuations to pass the time!
Here's mine all pricing in $Aud.
Minning cost/ per tonne $3.95
Downstream processing $34.61
Shipping / per tonne $13
Crushing / per tonne $6
Trucking transport / per tonne $30
Site cost $2
Tax $22.5
Total cost $112.06
Price per tonne 1.5% ore $200
Margin $87.94
Spodumene ore at 1.5% 1.8mill tonnes
Adjusting for minning recovery and dilution 90%
Margin x 1.62mill tonnes =$142,462,800 Aud.
Giving the fact that our dso price was $200 in may. Going off the the etf price of lithium is valued 30% higher there is still a possibility of a higher dso price.
I would say our cash flow over the 18 months could be between $120mill and $160mill and if bp33 can second that we will not be sitting on a mc of 22mill.
Some news plz drilling update or offtake by the 31st.
Cheers gltah
- Forums
- ASX - By Stock
- CXO
- Ann: Lithium Potential of the Barrow Creek Project Confirmed
Ann: Lithium Potential of the Barrow Creek Project Confirmed, page-160
-
- There are more pages in this discussion • 61 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CXO (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.7¢ |
Change
-0.002(1.70%) |
Mkt cap ! $184.8M |
Open | High | Low | Value | Volume |
8.7¢ | 9.0¢ | 8.6¢ | $490.5K | 5.591M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
22 | 1276076 | 8.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.7¢ | 613300 | 20 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
22 | 1276076 | 0.086 |
29 | 1447726 | 0.085 |
6 | 250000 | 0.084 |
4 | 69095 | 0.083 |
10 | 354270 | 0.082 |
Price($) | Vol. | No. |
---|---|---|
0.087 | 612600 | 20 |
0.088 | 474744 | 13 |
0.089 | 505796 | 7 |
0.090 | 369497 | 7 |
0.091 | 378805 | 3 |
Last trade - 13.49pm 05/09/2024 (20 minute delay) ? |
Featured News
CXO (ASX) Chart |