CXO 1.70% 8.7¢ core lithium ltd

Ann: Lithium Potential of the Barrow Creek Project Confirmed, page-160

  1. 233 Posts.
    lightbulb Created with Sketch. 172
    Lets hear some DSO valuations to pass the time!
    Here's mine all pricing in $Aud.

    Minning cost/ per tonne $3.95
    Downstream processing $34.61
    Shipping / per tonne $13
    Crushing / per tonne $6
    Trucking transport / per tonne $30
    Site cost $2
    Tax $22.5

    Total cost $112.06
    Price per tonne 1.5% ore $200
    Margin $87.94

    Spodumene ore at 1.5% 1.8mill tonnes
    Adjusting for minning recovery and dilution 90%

    Margin x 1.62mill tonnes =$142,462,800 Aud.

    Giving the fact that our dso price was $200 in may. Going off the the etf price of lithium is valued 30% higher there is still a possibility of a higher dso price.
    I would say our cash flow over the 18 months could be between $120mill and $160mill and if bp33 can second that we will not be sitting on a mc of 22mill.
    Some news plz drilling update or offtake by the 31st.
    Cheers gltah
 
watchlist Created with Sketch. Add CXO (ASX) to my watchlist
(20min delay)
Last
8.7¢
Change
-0.002(1.70%)
Mkt cap ! $184.8M
Open High Low Value Volume
8.7¢ 9.0¢ 8.6¢ $490.5K 5.591M

Buyers (Bids)

No. Vol. Price($)
22 1276076 8.6¢
 

Sellers (Offers)

Price($) Vol. No.
8.7¢ 613300 20
View Market Depth
Last trade - 13.49pm 05/09/2024 (20 minute delay) ?
CXO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.