COE 2.56% 19.0¢ cooper energy limited

kurnia progress, page-6

  1. 1,619 Posts.
    lightbulb Created with Sketch. 8
    I'm a bit with you Tony. At current drilling rate we are at least ten days from reaching 2500m and that's just a change of casing unless anything on the way to 2500m requires logging. I feel with the Cooper Basin completed for the moment and no new info coming out of Kurnia, the sp may take a further correction, how large a correction is anyone's guess.
 
watchlist Created with Sketch. Add COE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.