Good points Rob
If I was a Lend Lease engineer in charge of PASS disposal - my main concern would be the ability to dispose of PASS in a seamless manner. I would be constantly reminded by my superiors that the Boring Machine must stop for no-one and I would be constantly reminded by the EPA officials that PASS must be disposed of in accordance with the EES directives.
I cannot see dumping PASS at any landfill - includiing NAG if we had an operational landfill - as a viable option purely on the basis of being able to operate 24/7 and in all weather and still being able to lime-treat the PASS as per EES directives.
To date - no one - rampers and non rampers - cannot come up with a better solution than the NAG ponds to dispose of 1.4 million tonnes from the Metro Rail and let us not forget the 200,000 tonnes of PASS from the Transurban project.
- Forums
- ASX - By Stock
- NAG
- Landfill Rates
Landfill Rates, page-22
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NAG (ASX) to my watchlist
|
|||||
Last
1.0¢ |
Change
-0.002(16.7%) |
Mkt cap ! $7.966M |
Open | High | Low | Value | Volume |
1.0¢ | 1.0¢ | 1.0¢ | $900 | 90K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 154067 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.2¢ | 371750 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 154067 | 0.010 |
4 | 486666 | 0.009 |
2 | 182500 | 0.008 |
1 | 160000 | 0.007 |
1 | 250000 | 0.006 |
Price($) | Vol. | No. |
---|---|---|
0.012 | 371750 | 1 |
0.013 | 184429 | 2 |
0.014 | 610000 | 2 |
0.015 | 658165 | 1 |
0.016 | 188150 | 2 |
Last trade - 16.10pm 09/07/2024 (20 minute delay) ? |
Featured News
NAG (ASX) Chart |