When are the final details going to be revealed and isnt there a requirement from ASIC to be within 28 days of the 4 of September. Or I am wrong. The longer it takes the less probable it will be. HMMMM (DYOR People)
- Forums
- ASX - By Stock
- FAS
- takeover
takeover
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)