GBR 3.92% 4.9¢ great boulder resources limited

Ann: Copper-Nickel-Cobalt Discovery at Mt Venn, page-189

  1. 2,609 Posts.
    lightbulb Created with Sketch. 487
    Actually Tasminex hit grades of copper up to 2.85% Cu and 0.44% Ni in TDH3 on the tenements to the north, now controlled by Cazaly. That was within 13.1m @ 0.49% Cu.

    I can't find any information on historical drilling on our GBR tenements.

    Last month I posted the comments below with a link which lists the Tasminex drilling and Helix drilling to the north.
    ----
    More than just pyrrhotite intercepted just a few kilometres north along strike within Mt Venn North project area.

    Tasminex 13.1m @ 0.49% cu

    Helix Resources 4m @ 1.3% cu and 2m @ 1.2% ni

    A slide in this presentation (http://www.aspecthuntley.com.au/asxdata/20121227/pdf/01370772.pdf) shows some drill core from Tasminex TDH3 with cu to 2.85% cu, looks similar to the chips from GBR
 
watchlist Created with Sketch. Add GBR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.