taweil says:
"Reckon the TO won't happen before the drill tbh. Why gamble the money away when you can just wait for a sure thing. Sure, the price is going to double, triple whatever, but the profit is going to outweigh the cost anyways."
Great point when you have a once in a lifetime monster resource like this, which AVZ CEO Klaus Eckhof has stated could be TWO BILLION TONNES plus once fully JORCed. In that case, paying a premium for AVZ will be insignificant when potentially you could control lithium pricing and supply, aided by being the lowest cost producer with a tier one tin asset to pay for lithium mining and processing(offset transport costs), and cheaper other costs(labour etc.) than Australia.
Therefore, by waiting a little longer, which is not long(a few months) in the scheme of things AVZ could at least 3 bag from this point, and I would consider $1.00 conservative in this scenario!
AIMO
- Forums
- ASX - By Stock
- AVZ
- Ann: Manono Project Update
Ann: Manono Project Update, page-105
-
- There are more pages in this discussion • 76 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVZ (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online