I thought that the test plant was already built and they are putting the material through for QA functionality. Keep repeating tests to be at least 97 % sure operations are repeatable before moving on to 500 tonnes plant ? Or am I ahead of myself and my psyche has already built the test plant. Could be wishing for things sooner than later.
Cheers