Operating HX.
At this stage, it takes upto 3 people to operate HX.
1 x Pillot forklifter
1 x bricklayer on site
1 x driver/operater
Truck driver will have design screens in the cabin and controls over HX action.
The work will be carried out by heart of HX, the blackbox CPU.
Over the years, it's expected HX will be driverless, load, build all by itself, reducing operation to 1 personel only.
Mike also has a vision to keep HX control intuitive, to attrack young blood into the industy, joystick, control pad etc, but don't take this seriously it may or may never works that way in 10 years.
- Forums
- ASX - By Stock
- FBR
- Ann: Annual General Meeting Presentation
Ann: Annual General Meeting Presentation, page-22
-
-
- There are more pages in this discussion • 58 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $197.8M |
Open | High | Low | Value | Volume |
4.1¢ | 4.3¢ | 4.1¢ | $253.4K | 6.024M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
15 | 1225791 | 4.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.2¢ | 513275 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 968603 | 0.041 |
14 | 2009225 | 0.040 |
11 | 541571 | 0.039 |
3 | 731578 | 0.038 |
6 | 842347 | 0.037 |
Price($) | Vol. | No. |
---|---|---|
0.042 | 500000 | 1 |
0.043 | 496357 | 1 |
0.044 | 1341567 | 4 |
0.045 | 783301 | 6 |
0.046 | 917410 | 3 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
FBR (ASX) Chart |