No that's incorrect; its 2.2Mtpa stage 1 and stage 2 is double @4.4Mtpa
ASX ANNOUNCEMENT | 13 November 2017 SCOPING STUDY GIVES GREEN LIGHT FOR ALTURA LITHIUM PROJECT EXPANSION PLANS ■ Scoping Study confirms duplicating the size of the production plant to double output is the best expansion option ■ Mine life to remain greater than 10 years (based on current JORC Ore Reserve estimate) ■ Definitive Feasibility Study to start immediately to examine the doubling of capacity to 440,000 tpa of lithium concentrate ■ Minimal disruption expected to Stage 1 plant operations ■ Stage 1 commissioning remains on track for Q1 2018 and first sales in Q2 2018.
https://alturamining.com/wp-content/uploads/2017/11/1738902.pdf
- Forums
- ASX - By Stock
- 1MC
- Altura Mining Twitter
Altura Mining Twitter, page-664
-
-
- There are more pages in this discussion • 645 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 1MC (ASX) to my watchlist
|
|||||
Last
4.4¢ |
Change
0.001(2.33%) |
Mkt cap ! $10.87M |
Open | High | Low | Value | Volume |
4.3¢ | 4.5¢ | 4.3¢ | $1.277K | 29.16K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 202023 | 4.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.5¢ | 67604 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 202023 | 0.043 |
1 | 49886 | 0.042 |
4 | 226951 | 0.041 |
6 | 246083 | 0.040 |
1 | 18000 | 0.039 |
Price($) | Vol. | No. |
---|---|---|
0.045 | 67604 | 3 |
0.046 | 21739 | 1 |
0.047 | 45000 | 1 |
0.048 | 20833 | 1 |
0.049 | 40000 | 1 |
Last trade - 15.36pm 24/07/2024 (20 minute delay) ? |
Featured News
1MC (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
Previous Video
Next Video
SPONSORED BY The Market Online