Nice announcement!
* Mid Jan is a 2 week delay or so.
* A four rig however roughly means 25% more drilling (possibility was mentioned at the general meeting).
About 16 weeks til end of March 2018 roughly from end of year.
About 14 weeks til end of March 2018 with the delay from mid Jan.
So 13%ish less time, 25% more drilling speed.
The four rig will make up for the delay in my eyes.
* The downramps are very weak today. Not even worth addressing.
* Hole 7 is looking nice and massive! Lots of unweathered near surface pegmatite.