ARV 14.3% 1.2¢ artemis resources limited

100tph AU gravity plant delivered, page-31

  1. 5,090 Posts.
    lightbulb Created with Sketch. 1730
    Firstly gold particle size and distribution analysis should have been done months ag0-and a plant designed accordingly. As Novo are probably belatedly doing now -wont be anything like the wash plant. From that information ascertain comminution characteristics -the right crushing and/or grinding -you don't just race off to Karratha and hire a big jaw crusher for crushing road aggregate and then announce on Twitter no problems -we are going to crush to -5 mm ! And then put that hard abrasive material through a lightweight wash plant not designed for that material. The feed hopper will last five minutes -the trommel most likely a bit longer but I guess plenty of welders to patch them up -- And there will be some clay -I can see the crappy little sluices only designed for coarse gold blinding within hours -half the gold being lost - and taking all day to clean up manually instead of having proper jigs /concentrators to achieve accurate results. I will wager the hard mafic material will need to be crushed with a VSI or run through a ball mill to recover all the gold -5mm my a--- the blind leading the blind. All the hype -all the glitz -midnight streaming - substantial funds available and yet could not put in place proper analytical protocols - now cutting corners and people talking about saving money using a crappy little wash plant which will tell you very little -- for a project that was going to set the world on fire. Give me strength
 
watchlist Created with Sketch. Add ARV (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
-0.002(14.3%)
Mkt cap ! $23.00M
Open High Low Value Volume
1.3¢ 1.3¢ 1.2¢ $14.08K 1.159M

Buyers (Bids)

No. Vol. Price($)
5 263623 1.2¢
 

Sellers (Offers)

Price($) Vol. No.
1.3¢ 496924 4
View Market Depth
Last trade - 13.38pm 05/11/2024 (20 minute delay) ?
ARV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.