FMG had C1 costs of A$15/t last quarter operating in areas with a strip ratio of 1.5. We had C1 about A$37/t operation in presumably areas with a strip ratio of 0.25. Take out the rail v truck factor and we are still double their costs and we have to move half the dirt (1.25t vs 2.5t).
- Forums
- ASX - By Stock
- AGO
- AGO technical analysis
AGO technical analysis, page-1290
-
-
- There are more pages in this discussion • 467 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)