    The Announcements Office
    Australian Stock Exchange Ltd
    Level 3, 20 Bridge Street
    SYDNEY NSW 2000
    By ASX Online Transmission
    Dear Sir,
    Please find attached ASX/Media release regarding Erayinia Update.
    Yours faithfully
    Jutta Zimmermann
    Company Secretary
    4 December 2007 ASX CODE: ABU
    ASX ANNOUNCEMENT / MEDIA RELEASE
    Erayinia Update – Significant High grade Zn Intersected at King
    HIGHLIGHTS:
    A very significant and high grade intercept of 5 metres grading 10.6% Zn in drill hole ECD116 has been received from the northern lens at the King prospect, Erayinia Project.
    Results from drill hole ED116 show that Zn grades have increased with depth at King prospect
    Drill hole ED120 is currently underway to test the southern strike extension of the high grade intersection in ECD116 in the northern lens.
    A new DHTEM survey at King and other drill targets will commence this week to identify new conductors
    Project Background
    The Erayinia Project (70:30 JV with Great Gold Mines NL) is located approximately 150 km east south east of Kalgoorlie within an Archaean greenstone belt at the southeast margin of the Yilgarn Craton. Exploration carried out 14 years ago identified copper-zinc mineralisation in a possible Volcanic Massive Sulphide (VMS) environment. Focused exploration initiated by ABM Resources from 2005 onwards has confirmed the presence of a VMS zone (King prospect). A total of 25 drill targets have been identified within a 40 km long greenstone belt at Erayinia based on geophysical and geochemical anomalism. ABM is now intensifying its exploration drilling programs to determine the size and economic potential of its King prospect and determine if a cluster of VMS deposits occur within the broader project area.
    King Prospect – Current Diamond drilling program
    The diamond drilling program currently underway at King Prospect to test a series of strong DHTEM conductors identified during the September quarter has returned a very significant and high grade intersection of 5m grading 10.6% Zn in drill hole ECD116.
    A total of 10 surface diamond and diamond tail holes have been completed for 3466 metres in the current program.
    Assay results have now been received from six diamond holes completed during October and November. These are tabled as follows:
    Hole ID
    North
    East
    Interval
    M
    Width
    m
    Zn
    %
    Pb
    %
    Cu
    ppm
    Ag
    Ppm
    ECD088
    6538490
    484800
    415.5 – 417.5
    2
    1.05
    0.04
    203
    4
    ED112
    6538590
    484915
    562.9 – 564.9
    2
    1.1
    0.1
    426
    7
    ED113
    6538340
    484880
    Inc
    519 – 526
    519 – 520
    7
    1
    0.72
    17.4
    0.1
    152
    61
    6
    2
    ED114
    6538640
    484465
    232 – 237
    5
    4.6
    0.39
    341
    52
    ED115
    6538590
    484465
    248 – 253
    5
    1.5
    0.16
    1665
    13
    ED116
    6538640
    484795
    425.5 – 431.5
    5
    10.6
    0.56
    242
    35
    Drill hole ED116 on section 6538640 N was designed to test the depth extension of the northern VMS lens and has achieved that objective with an intersection of 5m @ 10.6% Zn. Drill holeED114 with 5m @ 4.6 % Zn was drilled to infill on section 6538640 N and test the up-dip extension of mineralisation in previously drilled hole ECD056.
    The diamond drilling program is continuing to test the strike continuity of the high grade intersection in ED116 with the northern lens. Results from drill hole ED116 show that Zn grades have increased with depth at King prospect
    Drill hole ED113 has returned an intersection of 1m grading 17.4% Zn within a broader zone of 7m @ 0.72% Zn possibly indicating that the southern lens is forming a higher grade core.
    A mineral assemblage consisting of pyrite, pyrrhotite, magnetite and sphalerite has been intersected in all drill holes. Recent exploration has shown the mineralised zone to comprise two parts, on-line, with a barren section of about 150m in between. The zinc bearing sulphide mineralisation within both the northern and southern lenses has been extended down-plunge to a depth of 450 metres (see attached King Prospect Long Section).
    A new program of diamond drilling is expected to commence in February 2008 when a diamond drilling rig is available.
    King Prospect Long Section
    Other targets E2 to E25
    RC and diamond drilling to date at King has provided a better understanding of the VMS system at Erayinia. As a result, an RC drilling program and new DHTEM survey will be completed to include a number of the other 24 “thumbprint� magnetic anomalies/targets within the 40 km long Erayinia Archean greenstone belt. A new DHTEM survey will commence this week to identify new conductors. These new targets have the potential to host further VMS deposits at Erayinia.
    A 4,000 metre RC drilling program is scheduled to commence in January 2008 to complete the following:
    • Follow up drilling to test the strike extension of the VMS base metal mineralisation outlined at the E2 prospect.
    • First pass testing of the large number of “thumbprint� magnetic anomalies.
    For any questions on the release please contact:
    Mr Imants Kins
    Executive Chairman
    +61 8 9423 9777
    ABOUT ABM RESOURCES NL:
    The company has a portfolio of base metal (zinc, lead, copper) projects located in Western Australia and a Joint Venture gold project in Mozambique. The conceptual exploration framework of the company is focused on delineating major mineral discoveries.
    The primary exploration focus is the substantial region-scale Volcanic Massive Sulphide (VMS) base metal JV project at Erayinia located in Western Australia. ABM Resources also holds interests in a recently acquired JV gold project in Mozambique and another three base metal projects, Gascoyne, Earaheedy and Harbutt Range in Western Australia.
    ABM Resources entered into a formal Cooperative Agreement with AYR Infrastructure in May 2007 and earlier an MOU with its related company Ayr Resources Africa with the objective of securing high quality gold and other mineral projects in selected countries in Africa with a view to outlining significant mineral deposits. A due diligence process is also underway in Zambia regarding prospects for copper and associated minerals. Ayr Infrastructure Development (AID) is a global consulting and development organisation developing sustainable infrastructure in the emerging markets around the world.
    The information in this Report that relates to Exploration results is based on information compiled by Harjinder Kehal who is a member of the Australasian Institute of Mining and Metallurgy. Harjinder Kehal is a Consultant Geologist with over 20 years experience as a geologist.
    Harjinder Kehal has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity for which he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the Australasian Code for Reporting of Exploration results, Mineral Resources and Ore Reserves. Harjinder Kehal consents to the inclusion in the report of the matters based on his information in the form and context in which it is used.


    here we go here we go here we go. Tho i wasnt expecting an update this week but hey good news all the same
 
watchlist Created with Sketch. Add GNL (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.