    i forgot to calculate ramps and possible switch back's, 20 - 25 meter width for Cat 789B 200 tonne trucks, not a big deal when cosidering the 100 meters i left for the pit foor, a huge pit floor would usually be designed for the mine to go underground through a port hole and have work space at the bottom and allow plenty of saftey, rock falls, ETC. Open cut then under ground is a very common practice to access very deep ore body's as open cut mining becomes less eficient at a certain depth, sometimes operation's run both at the same time.
 
watchlist Created with Sketch. Add BMN (ASX) to my watchlist
(20min delay)
Last
$3.33
Change
-0.200(5.67%)
Mkt cap ! $594.7M
Open High Low Value Volume
$3.50 $3.50 $3.32 $2.134M 629.3K

Buyers (Bids)

No. Vol. Price($)
1 15000 $3.31
 

Sellers (Offers)

Price($) Vol. No.
$3.35 7300 1
View Market Depth
Last trade - 16.10pm 18/10/2024 (20 minute delay) ?
BMN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.