COE 0.00% 19.5¢ cooper energy limited

pre-open!!!! eom, page-2

  1. 1,987 Posts.
    re: pre-open!!!! worrior completed for production Worrior completed for production.

    Initial target flow is 1200-1600 bopd - transported by truck.

    Also announced a survey to determine the signifigance of the Patchawarra gas zone to commence in April 2004.

    Pipeline economics study aready commenced.

    Great stuff.

    Cheers

    Badfish
 
watchlist Created with Sketch. Add COE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.