They definitely could have drilled more than 250 meters since first of Feb, I use the link below as reference but even simple math and commonsense also point to a hole or 2 already.
Jorc early Q2 so assume drilling for 3 months for 20000m using 5 rigs so :
(20000 / 90) / 5 = 44.44 meters per day per rig.
It has been 12 days since last drilling commencement announcement.