14 Days to drill 1 hole presumably with 1 rig.
With 5 rigs drilling, we'll get 5 holes in 14 days.
Total time to drill 80 holes is 224 days?
Does that sound right or have I stuffed up by calculations?
- Forums
- ASX - By Stock
- AVZ
- Ann: AVZ achieves record intersection at Manono
Ann: AVZ achieves record intersection at Manono, page-130
-
-
- There are more pages in this discussion • 223 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)